Four ways in.
Four needs, one answer behind each. Many projects start with one and add another.
“Add to, run, or back up our QA/QC program”
Supplement the program you run, operate it, or back it up. The depth is your call.
“Verify the work independently of the contractor”
Checked against the contract documents, alongside the contractor's own QC. Project terms or on-call agreement.
“Cover a scope under our name”
Overflow, CWI and NDT, source inspection at the fabricator, and structural scopes a geotech practice may not self-perform. Under your name, in your format. Counts toward SBE and VSBE goals; DBE in progress.
“Cover a code-required inspection”
IBC and CBC Chapter 17, structural observation, deputy coverage in LA, Long Beach and LA County. Sometimes a job just needs a carded inspector on Tuesday.
Inspection, testing and
quality programs.
A retained program that runs alongside your team for the duration, or a single inspection or testing scope on a defined package of work. Retained directly, or as a subconsultant to laboratories and primes.
Embedded QA/QC
Inside your team, carrying the ITP, the hold points and the record, so your QC manager is not carrying it alone.
- QA/QC plan and inspection and test plan
- Hold and witness point register
- Non-conformance tracking to closure
- Turnover and closeout packages
Independent Quality Assurance
Independent of the party doing the work, checked against the contract documents, alongside the contractor's own QC.
- Independent verification of contractor QC
- USACE three-phase control
- Material traceability and mill certificates
- Turnover documentation packages
Inspection Readiness and Evidence
We walk the area and attach the evidence before the request goes in, so it passes the first time.
- Pre-request area walks
- Photo evidence with the code basis attached
- Condition register, open to verified closed
- AHJ and SEOR coordination
Special and Deputy Inspection
Per the Statement of Special Inspections, by ICC-certified inspectors carrying the deputy card for the jurisdiction.
Structural Observation and Threshold
Phased visits with the SEOR, a deficiency log carried to resolution, the final observation letter.
MEP Inspection and QA
Mechanical, electrical and plumbing inspection and quality support, by people who have run these systems.
Non-Destructive Testing
UT, MT and PT on welds and structural connections, in house.
Source and Shop Inspection
At the fabricator: traceability, heat numbers, weld and bolt QA before it ships. CWI-led.
Materials Testing
Field sampling of concrete, masonry and soils; lab breaks through our ISO/IEC 17025 accredited partner.
From drawing review to closeout.
Structured around your project schedule, not a lab's dispatch queue.
Drawing & Program Review
Statement of Special Inspections, drawings and specs, before the first pour.
Pre-Construction Meeting
Scope, hold points, phasing and reporting agreed with the GC, SEOR and AHJ.
Field Inspections
On site per the program. Same-day reports. The same person every visit.
Closeout Package
Summary report, field logs, NCR resolution and observation letters, ready for the AHJ.
Tell us the scope, the jurisdiction and the start window.
We will come back with coverage, the quality manager we would put on it, and the cost.